
The district restored the Souq Street section from the El Saayda bridge to the Mahmoudiya axis, after the works that had required the road to be opened.
MP Ramadan Batiea attended, and the roads and bridges directorate, Telecom Egypt and the electricity, natural gas, water and sewerage companies took part.
Sources
- The post on El Montazah I’s site (opens in a new tab)
A summary of a post on the district’s official site; see the post for details and photographs.
