Projects

Streets in Mohsen and El Falaki made ready for asphalt

Souq Street in Mohsen, Old School Street and the side streets of Street 16 El Eslah in El Falaki, once the earth layer was ready.

The district head, with MP Ramadan Batiea, Senator Zein El Abedin Kamel and the roads directorate, checked on site several streets being prepared for asphalt.

They covered Souq Street in Mohsen, Old School Street and the side streets of Street 16 El Eslah in El Falaki, and dealt with exposed telephone and power cables on the sites so the plan would not stall.

Sources