From the technology centre’s guide
Documents needed
- The lift installation contract with a specialist lift company, approved by the Contractors' Federation, and a copy of its licence to practise
- A copy of the applicant's ID card (the owner, the union officer, or an authorisation or power of attorney)
- The lift's mechanical drawing, approved by the company, showing the dimensions of the shaft and the machine room and a longitudinal section of each
- A copy of the building permit
- A copy of the company's registration with the Egyptian Federation for Construction Contractors, or a copy of the company's licence to operate
- The ground-floor engineering drawing showing the lift's position and dimensions at a scale of at least 1:100, approved by a syndicate-registered engineer
- The lift's technical specification file: copies of the model and component test certificates, and a calculation note covering the guide-rail calculations, the rope safety factor, the traction calculations and the specific pressure on the shaft buffers
- The receipt for fees paid to the Engineers' Syndicate on the value of the works
- A consultant engineer's report, approved by the Engineers' Syndicate, confirming the building can bear a lift
- A certificate from the installing company confirming the works were carried out according to the law and the Egyptian code
- Timescale
- The district does not publish this service’s timescale; ask when you apply.
- Where to apply
- The technology citizen service centre, El Montazah I District, or the Local Government Services portal
- Official document
- Page 15 of the technology centre’s guide to required documents
Check the document list before visiting. Ask the responsible office about anything unclear or unavailable to you.